M-TECH offers end-to-end services for the deployment of climate and weather radar systems, encompassing civil works, mechanical installation, and electrical integration. Leveraging decades of expertise in meteorological engineering and project management, we ensure that every radar installation meets the highest standards of performance, safety, and regulatory compliance.
• Experience: Over 15 years in meteorological and environmental monitoring projects.
• Certifications: ISO 9001, IEC compliance, FCC/ITU approvals.
Scope of Services
Civil Works
• Site Survey & Geotechnical Analysis: Soil testing, topographical mapping, foundation design.
• Earthworks & Foundation Construction: Excavation, reinforced concrete pad, anchor bolts.
• Tower/Structure Erection: Assembly of radar pedestals, monopoles, or support towers.
• Radome Installation: Radome assembly, sealing, and environmental protection.
Mechanical Installation
• Radar Unit Handling & Mounting: Lifting, alignment, and securing of transmit/receive modules.
• Azimuth/Elevation Drive Integration: Precision installation of rotation drives and gearbox systems.
• Environmental Controls: HVAC unit placement within shelter or cabin to maintain optimal electronics temperature.
Electrical Integration
• Power Distribution: Main feeder installation, backup generator and battery bank integration.
• Grounding & Lightning Protection: Earthing grid design, surge arrestors, and lightning rods.
• Signal & Data Cabling: Fiber-optic trunk lines, coaxial waveguide runs, shielded copper cabling.
• Control & Monitoring Panel: PLC setup, local HMI interfaces, remote SCADA integration.
Commissioning & Testing
• Factory Acceptance Test (FAT) Support: Witness tests, functional checklists, and pre-shipment validation.
• On-Site Commissioning: Alignment verification, transmitter power calibration, receiver sensitivity tuning.
• System Validation: Doppler spectrum analysis, dual-polarization calibration, clutter suppression checks.
• Acceptance Testing (SAT): Performance benchmarks against contract specifications and meteorological standards.
Quality Assurance & Safety
• QA/QC Plan: Documented procedures, inspection points, non-conformance reporting.
• Safety Management: Risk assessments, method statements, PPE enforcement, and job safety observations.
• Environmental Compliance: Waste management, spill prevention, radome material recycling.
Project Management & Timeline
Phase Deliverables Duration
Mobilization Mobilization report, site certificates 2 weeks
Civil Construction Completed foundations, tower erected 4–6 weeks
Mechanical & Electrical Installed radar unit & wiring 3–4 weeks
Commissioning & Testing Test reports, FAT/SAT certificates 2 weeks
Handover As-built drawings, O&M manuals 1 week
Deliverables
• Detailed site survey and geotechnical report
• Structural drawings and load calculations
• Installation checklists and progress photographs
• Commissioning and performance test reports
• O&M manuals, warranty documents, and training sessions
Compliance & Standards
• International: WMO, IEC 60815, IEEE
• Regional: FCC/ITU emission limits, local building codes
• Environmental: ISO 14001, RoHS, REACH